What this covers
- Task validity review — whether each existing task addresses a real failure mode.
- Interval review — tasks being done more often than the failure characteristics justify, and less often than they should be.
- Duplication — the same check performed under two different work orders.
- Gap identification — significant failure modes with no task covering them.
- Resource loading — how manpower is distributed against asset criticality.
- Work order and history review — using your own maintenance records to find where effort is being wasted.
- Condition monitoring — where a predictive technique would replace an intrusive routine.
What you receive
- Current programme assessment with findings quantified
- Revised task list with additions, deletions and interval changes marked
- Estimated effort and cost impact of the changes
- Phased implementation plan
Standards and references
Work references SAE JA1011 for maintenance task selection logic, IEC 60300-3-11 for dependability, and ISO 14224 for equipment taxonomy and failure data.
Related services
RCM Strategy Development
Risk-based maintenance strategy built around how each asset actually fails.
Criticality & FMECA Analysis
Failure mode and criticality analysis that directs budget to the assets that matter most.
System-Wide Reliability Strategy
Reliability strategy across power systems, protection equipment and rotating machinery.
Need maintenance program optimization scoped?
Work directly with the engineers doing the analysis — clear scoping from the first conversation.
Get in Touch